Agree what will happen
Confirm the time, who will attend and when you receive access. Have the agreement, draft inventory and list of promised repairs ready. If something is unfinished, record it and agree the next step instead of leaving a verbal reminder. Do not confirm a handover that has not actually happened.
Record the things you can count
Count keys, access fobs and remotes. Record readings and identifying numbers for the relevant electricity and water meters where safely accessible. Clarify the date up to which previous bills are settled. Describe furniture and appliances clearly enough to identify them again at move-out.
Photograph condition, not just rooms
Take an overview of each room and close-ups of existing defects. For example: ‘Living-room table—scratch on the right edge’, rather than ‘signs of use’. Both parties should review the record and receive the same copy. Keep original files somewhere you can access even if a chat is no longer available.
Before the first evening
Ask for appliance and heating instructions and an emergency contact. Understand building rules and how bills arrive. If you discover a problem after handover, report it promptly with a date, description and a photo where safe. A short walkthrough cannot be assumed to reveal every hidden fault.
In Hazain: the next step
Open the handover record for the correct lease. Add rooms, inventory, keys and meter readings, review photos together and note differences before signing.
Example: “Bedroom — scratch on the door, photo2; electricity meter — reading recorded on the handover date.” A signed lease, signed handover record and actual move-in are separate events.
